hero-image
HOME
hero-image
project-highlight-image

Petron Bataan Refinery (C343)

hero-image
SYAFIQ AIMAN BIN SHAMSUDIN

OVERVIEW

I supported routing modifications based on stress analysis results and produced iso and GA updates to meet engineering requirements.

HighlightS

• Designing piping according to media specifications.

• Modifying piping based on stress analysis results.

• Producing piping iso drawings.

• Identifying support positions.

• Producing GA Drawings.

• Preparing Navisworks for internal review.

SKILLS

AutoCAD Plant 3DNavisworks

Additional Details

C343 2.pngC343 1.png

lowinertia
Portfolio Builder for Engineers
Created by Aram Lee
© 2025 Low Inertia. All rights reserved.