Developed an access platform to support workers performing concrete dam repairs along the I-15 corridor. My responsibilities included creating the platform layout, member sizing, and anchor detailing to ensure stability, safety, and accessibility. The system was tailored to site conditions and coordinated with field crews to enable efficient construction sequencing and minimize downtime during repairs.

SKILLS

CSA Wood Code (O86), Steel Code (S16)AutoCADRisa SuiteMathcadStructural Engineering InspectionConcrete Anchor Analysis