Concrete Joint Reconstruction Formwork Design

hero-image
Adam Babar

OVERVIEW

Contributed to an LRT infrastructure project requiring reconstruction of structural joints at multiple locations. I designed formwork systems from scratch that could be applied consistently across all sites, including detailing anchor connections. The goal was to provide adaptable, safe, and constructible solutions that streamlined installation while maintaining compliance with engineering standards.

SKILLS

RISA SuiteCSA Wood Code (O86), Steel Code (S16), Concrete Code (A23.3)Concrete Anchor AnalysisFormwork Temporary DesignMathcadAutoCAD